|

Plan of typical framed building
|
Check
sequence :
A. Corner colums and beams.
B. Peripheral columns and beams.
C. Cantievered beams (for balcony covered framed buildings).
D. Stair walls and columns and lift walls.
E. Columns at upper levels.
F. Water tanks.
G. Infil and partition walls.
H. As a precautionary measure the beams and columns as well as their
junctions at all levels must be checked.
|